IRRIGATION:

General
Although in recent times MULTI has diversified its services into many fields, irrigation sector is the core of its activities. MULTI's involvement in this sector coincides with the introduction of local consulting activities in DOI projects, and has to it's credit experience in most of the irrigation related consulting assignments, executed during the last two decades. During this period, MULTI has witnessed evolvement of several policies and strategies adopted by the executing agencies and shares the responsibility for its success and failures.

Experience with FMIS
MULTI's initial experience with FMIS of Talkulo Khola Hill Irrigation Project (1981), Gunjantar Irrigation Project (1982) and Bhirpani Irrigation Project (1982) was thought provoking in terms of conceptualization of beneficiary participation potentials. Subsequently MULTI was entrusted with detail feasibility study of two noted farmer's managed irrigation projects of terai and hills in the year 1984-85, namely Arjun Khola Irrigation Project and Phalangu Khola Irrigation Project. It was an opportunity to assess project implementation practices involving beneficiary participation in project preparation, implementation, monitoring and operation & maintenance. MULTI was able to identify problems andconstraint to O & M in these FMIS. Arjun Khola I.P. had been duly constructed under EEC financing, in accordance with the proposed recommendations of the study. Accordingly, MULTI utilized experience gained in these projects for Daha Khola Irrigation Project (1988).

Water Use Inventory Study of several districts in Nepal conducted by Water and Energy Commission Secretariat (WECS) was a major step towards identifying the potential of FMIS in Nepal. MULTI was entrusted for the study of six districts and took leading part in emphasizing the study for identification and appraisal of FMIS throughout the country.

With the initiation of the Irrigation Sector Program in February, 1988 HMG/N approach to irrigation development included concerns for : (a) making the irrigation development more cost effective through the adoption of appropriate technologies (b) speeding up implementation through investment in quick results generating small and medium scale irrigation schemes and (c) building indigenous institutional capacity. MULTI executed two projects for detailed feasibility studies namely Melchada Khola Irrigation Project (1989) and Majhgaon Irrigation Project (1989) under ISP/DOI. Besides, it was involved in the project identification, selection, formation of WUAs and pre-feasibility study of several ISP sub-projects in Sankhuwasabha, Terharthum and Jhapa districts of Nepal in the year 1990-91.

MULTI's culmination of its efforts to strengthen WUAs and experience with FMIS, is well exhibited in the recently completed detail feasibility study of one of the largest FMIS (24,000 ha GCA) of the country, namely Rani, Jamara and Kulariya Kulo Irrigation Project. This project executed by IDSP/DOI with the financial assistance of IDA/WB, has been approached under "The Irrigation Policy 1992 of HMG/Nepal". One of the main outcome of the study is recommend actions of measures for strengthening existing institutional framework of WUA, leading to their effective participation in the implementation and O & M of the system.

Experience in Public Irrigation System
MULTI had been involved in most of the major public irrigation projects in the country. MULTI's involvement in water management activities of Narayani Irrigation Project and Sunsari Morang Irrigation Project Stage II had given an opportunity to work closely with the WUGs. MULTI's personnel were involved in group formation, training to WUGs, assistance in legalization of WUGs through registration at district offices and preparation of maps and land ownership list for an effective management of irrigation water and possible collection of water tariff. Experience gained by MULTI in some of the major irrigation projects are enlisted as below:

List of Major Projects under taken by MULTI Disciplinary Consultants (P) Ltd.


1. Flood Protection of NZIDP Command Area, WB/HMG, 1989

2. Comprehensive Plan for the Protection of Narayani Zone Irrigation Development Project Command Area and River Training of Bagmati and Lal Bakeya River, HMG, 1991

3. Narayani III Irrigation Project Reconnaissance Review Study of Regional Water Resources and Flood Protection 1990

4. Water Management and Hydrometric Studies : Narayani Irrigation Project (Jan 1992 - March 1992)

5. Sunsari Morang Irrigation Project Construction and Command Area Development Phase (1989-1994)

6. Sunsari Morang Irrigation Project Stage - III; IDA/DOI; 1994-95

7. Rani, Jamara, Kularia (RJK) Irrigation Project (IBRD/DOI) 1993-94

8. Water Use Inventory Study of Surkhet, Dang, Kabreplanchok, Doti, Baglung and Dhanusa Districts, WECS, 1980-1990

9. Topographical Survey and Mapping of Bagmati Irrigation project, HMG 1987

10. Land Acquisition Map Preparation for Mahakali Irrigation Project, HMG 1984

11. Bagmati Command Area Development Project.

12. Irrigation Sub-sector Data - Base (CIWEC) 1983

13. Bench Mark Survey of Sunsari Morang Irrigation Project, HMG, 1980 - 82

14. Sunsari Morang Irrigation Project Stage-I, WB/HMG, 1980 - 83

15. Sunsari Morang Irrigation Project Stage-II, IDB/HMG, 1987

16. Mahakali Irrigation Project Stage-I, HMG, 1983

17. Khutiya Irrigation Project Phase-II, UNCDF/HMG, 1992

18. Arjun Khola Irrigation Project, HMG, 1985

19. Gunjatar Irrigation Project, HMG, 1983

20. Phalangu Khola Irrigation Project, HMG, 1985

21. Bhirpani Irrigation Project, HMG, 1984

22. Daha Khola Irrigation Project, HMG, 1988

23. Flood Damage Assessment and Control Measures of Babai, Tinau, Biring, Andhi Khola and West Rapti Rivers, HMG, 1989

24. East Rapti Irrigation Project, ADB/HMG, 1986

25. Gairimudi Irrigation Project, HMG, 1983

26. Ghatte Khola Irrigation Project, HMG, 1983

27. Holu Bhairavi Irrigation Project, HMG, 1982

28. Talkulla Irrigation Project, HMG, 1984.

29. Road Flood Rehabilitation Project, HMG, 1991

30. Head Work Cost Reduction Study for East Rapti Irrigation Project, ADB/Nippon Koei/ HMG, 1988

31. Melchada Irrigation Project, DOI, 1989

32. Majgoan Irrigation Project, DOI, 1989

33. Bagha Khola Irrigation Sub-Project, DOI, 1989.

34. Malta Khola Irrigation Sub-Project, DOI, 1989

35. Bhalu Khola Irrigation Sub-Project, DOI, 1989

36. Iwa Khola Irrigation Sub-Project, DOI, 1989

37. Khorunga Khola Irrigation Sub-Project, DOI, 1989

38. Gauriya Khola Irrigation Sub-Project, DOI, 1989

39. Crop Yield Survey, IHDP/SATA, 1985-1987

40. Nepal Irrigation Sector Project, DOI/ World Bank, Credit No. 3009-NEP,1998

P.O. Box 5720, Kathmandu, Nepal , Tel: +9771 5525076 / 5529304 ,
Fax: +9771 5523103, Email: mdc@multinepal.com.np
Providing professional service since 1978 
Contact Us Home
Untitled Document